Linking a cardwall plan to a task in a waterfall plan

Hi,

We want to run hybrid projects with a high-level waterfall plan and sprints that require individual cardwall plans. Ideally, when we select a task 9sprint) in the waterfall plan, it would link directly to a new card wall for that sprint. Is that an option in TDX?

Thanks!

Asked by Constantin de Boisseson on Tue 4/9/24 1:29 PM
Sign In to leave feedback or contribute an answer

Answer (1)

This answer has been marked as the accepted answer
Brittany Renn Tue 4/9/24 1:37 PM

Hi Constantin,

I suppose you could paste the link to the Cardwall plan task in the Waterfall task description but there's not really a way to hyperlink a waterfall task to open a cardwall task. You'd have to past the link in one of the columns for the Waterfall task and then have users refer to that link. 

Best,
Brittany Renn
TDX Support